在加工棚拆除前須進行技術交底!
來源:http://prabhusubramaniyan.com/ 發布時間:2023-02-20
在施工過程中搭建木工加工棚一定要注意做好防護措施,施工人員一定要按照施工要求進行施工。露天的攪拌機位置,現場混凝土攪拌機、卷揚機棚、鋼筋棚、木工棚以及一些出入口,現場廁所需要等都需要搭設木工加工棚。由于建筑使用的木工加工棚增多,使得很多廠家都可以制作木工加工棚。
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Due to the increase of woodworking sheds used in buildings, many manufacturers can make woodworking sheds.
木工加工棚在建筑工地上是保護建筑施工材料的堆放、為了防止工地物品不受雨水淋濕導致生銹。 木工加工棚搭設完畢后,須經過專職員驗收合格,方可投入使用。在加工棚搭設和拆除前,須進行技術交底。
The carpentry processing shed is used to protect the stacking of construction materials on the construction site, and to prevent the rusting of site items from being soaked by rain. After the carpentry processing shed is erected, it can only be put into use after passing the acceptance of the full-time safety officer. Before the erection and removal of the processing shed, safety technical disclosure must be carried out.
高處作業人員須經過技術培訓及考試合格,持證上崗。木工加工棚采用的鋼管、扣件等材料須符合技術規范及有關標準要求。搭設和拆除水平木工加工棚時,操作工人的“三寶”須齊備,且應正確使用。
High-altitude operators must receive professional technical training and pass the professional examination, and work with certificates. The steel pipes, fasteners and other materials used in the woodworking shed must meet the requirements of safety technical specifications and relevant standards. When erecting and dismantling the horizontal woodworking processing shed, the operators' "three treasures of safety" must be complete and used correctly.
在木工加工棚搭拆時,應避免上下同時作業,把操作時間錯開。搭拆木工加工棚時,所有材料、工具應堆放在建筑物外邊線以內少2m,堆碼高度不超過1m。拆除的材料須傳遞到樓層內并及時運走,嚴禁高空拋擲。搭拆木工加工棚時,應在地面設置警戒區,并派專人監護。
When erecting and dismantling the woodworking shed, it is necessary to avoid working up and down at the same time and stagger the operation time. When erecting and dismantling the woodworking processing shed, all materials and tools shall be stacked at least 2m within the outer boundary of the building, and the stacking height shall not exceed 1m. The removed materials must be transferred to the floor and transported away in time. Throwing from high altitude is strictly prohibited. When erecting and dismantling the woodworking processing shed, a warning area should be set on the ground and a special person should be assigned to monitor it.
木工加工棚搭拆時,要有專人指揮。管理人員要做到:眼勤、腿勤、嘴勤,對危險情況要積極采取有效防護措施,確保人員。雨天、大風天氣,暫停木工加工棚搭拆施工,并應檢查維護木工加工棚的。
When erecting and dismantling the woodworking shed, a special person shall be assigned to command. The management personnel shall be diligent in eyes, legs and mouth, and actively take effective safety protection measures for dangerous situations to ensure personnel safety. In rainy and windy weather, the erection and dismantling of woodworking processing shed shall be suspended, and the safety of woodworking processing shed shall be checked and maintained.
在施工過程中搭建木工加工棚一定要注意做好防護措施,施工人員一定要按照施工要求進行施工。露天的攪拌機位置,現場混凝土攪拌機、卷揚機棚、鋼筋棚、木工棚以及一些出入口,現場廁所需要等都需要搭設木工加工棚。您有需求就來我們網站http://prabhusubramaniyan.com咨詢吧!
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Come to our website if you need http://prabhusubramaniyan.com Ask!